Geotechnical Engineers will be conducting drilling works on site at the Saltwater River landslip area between the 29 to 31 January. During that time, the length of the traffic barriers and single lane will be extended for worker safety, but the flow of traffic will not be impacted. Once the works are complete, the traffic barriers will be returned to where they currently are. This work is part of the larger project to reinstate the road.