Please be advised that footbridge repair works will commence on Nubeena Foreshore Monday 16th September 2024.
For the duration of these works the foreshore walking path will be closed to the public from the George Street access point to the Peninsula Aquatic club access point.
Please utilise the footpath on the other side of the road to ensure everyone’s safety.
Updates for re-opening this section of walkway will be provided when possible.